|
SMTA Cost Estimating Guidelines Feature ProfitPro |
|
|
|
Monday, 15 November 2004 |
|
Featuring ProfitPro, an Excel-based software application that calculates the cost and profit related to PWB assembly, the SMTA Cost Estimating Guidelines are
intended to model real-time cost estimating (RTCE) in the electronics
industry. The guidelines are arranged by Dr. Ronald C. Lasky, Indium
Corp. of America/Dartmouth College.
Using
these production variables such as cycle time, hours/shift, shifts/day,
days/week, set up time and dowtime, ProfitPro can model RTCE for
high-volume, low-mix to low-volume, high-mix lines. Has default values of unknown cost metrics, can calculate "what-if" scenarios, including:
- The amount of profit gained if setup time is reduced.
- The amount of profit gained if cycle time is decreased.
- The amount of profit gained if new equipment or materials increases productivity.
http://www.smta.org/store/book_store.cfm
|