MYPlan v. 4.1 includes a Job Sequence Optimizer. Calculates the best production sequence and changeover strategy for any mix of products and batch sizes. Eliminates unnecessary feeder movements. Automatically calculates an optimized job sequence, using an optimization algorithm that takes both machine speed and feeder loading effort into account. Suitable jobs run together based on part commonality; are placed in family kits. Other jobs will be run separately, with different changeover strategies depending on batch size and priority, including prototypes, large batches, and variants. Is fully integrated with the material handling system MYLabel and the automated storage solution SMD Tower. Provides full visibility of material status and availability.

Mydata Automation, www.mydata.com

 

Submit to FacebookSubmit to Google PlusSubmit to TwitterSubmit to LinkedInPrint Article
Don't have an account yet? Register Now!

Sign in to your account