caLogo

AVON, MA ― September 2021 ― StaticStop, a division of SelecTech, Inc., and leader in the manufacture of innovative ESD flooring products that save time and money, is working hard to offset the long lead times the industry is facing. The company has increased inventory of raw materials to offset supply-chain disruptions.

By increasing inventory of all raw materials and putting in place rolling material orders, ahead of customer orders, StaticStop is able to ensure a consistent flow of raw materials. The company has doubled the manufacturing capacity of its two interlocking options, providing the ability to respond to short-term needs more quickly.
 
With its strong technical background and R&D capability, StaticStop has been able to reformulate its static-control materials to utilize advanced metallic composite additives rather than traditional carbon-based additives, opening up additional supply options to meet customer demands. With the team’s advanced knowledge in static control and materials science, StaticStop was able to develop these advanced material blends that provide exceptional ESD performance.

To request a sample of FreeStyle ESD or any other ESD flooring samples, or information for the complete ESD Flooring line, please call 508-583-3200 or visit www.staticstop.com.

Submit to FacebookSubmit to Google PlusSubmit to TwitterSubmit to LinkedInPrint Article
Don't have an account yet? Register Now!

Sign in to your account