caLogo

Jerry Johnson

Striking the right balance between costs and cycle time.

Decisions made in product design can impact assembly cost, defect opportunities and inventory cost. While design for manufacturability (DfM) analysis can eliminate many issues, less commonly analyzed decisions related to cost targets, scheduling and work team assignments can have unintended consequences that generate unacceptable levels of waste.

Lean manufacturing practitioners are aware of Taiichi Ohno’s concept of the seven wastes (muda) in manufacturing as part of the Toyota Production System (TPS). To recap, those seven wastes are:

  1. Waste of overproducing (no immediate need for product being produced).
  2. Waste of waiting (idle time between operations).
  3. Waste of transport (product moving more than necessary).
  4. Waste of processing (doing more than what is necessary).
  5. Waste of inventory (excess above what was required).
  6. Waste of motion (any motion not necessary outside of production).
  7. Waste of defects (producing defects requiring rework).

To continue reading, please log in or register using the link in the upper right corner of the page.

Submit to FacebookSubmit to Google PlusSubmit to TwitterSubmit to LinkedInPrint Article
Don't have an account yet? Register Now!

Sign in to your account